Combined Heat and Power plant in Vasteras
Outline of new project
New CFB Boiler:
- Compact CFB Technology
- INTREX heat exchanger
- Fuels
- Steam parameters
- Emission control
- Flue gas condensing plant.
Connection with existing power plant:
- Water chemistry
- Feed water pumps
- High pressure feed water heaters
- Main steam connection
- Reheat steam connection
- Sliding pressure operation
- Load changes
Training simulator.