|
Data Ins. |
Tipo Doc. |
Titolo |
Org. Tec. |
Num. Doc. |
Data Scad. |
Cod. Doc. |
|
|
23/12/2014 |
Documento di Lavoro |
CEN/TC 156 document N. 1303: prCEN/TR 13779 (prTR 16798-4:2014) "Ventilation for non-residential buildings Performance requirements for ventilation, air conditioning and room-conditioning systems (Revision EN 13779) Technical Report"
|
LC |
|
|
|
|
|
23/12/2014 |
Documento di Lavoro |
CEN/TC 156 document N. 1302: draft of prCEN/TR NNN:2013 "Technical report to energy performance of buildings - Module MX-Y-Z, Title of procedure MX-Y-Z - Subtitle of procedure MX-Y-Z"
|
LC |
|
|
|
|
|
23/12/2014 |
Documento di Lavoro |
CEN/TC 156 document N. 1301: M5-6-8, prEN 16798-5-2 (draft 5)
|
LC |
|
|
|
|
|
23/12/2014 |
Documento di Lavoro |
Schedule enquiry for EPB Standards
|
LC |
|
|
|
|
|
23/12/2014 |
Documento di Lavoro |
Enquiry versions for CEN/TC 228 documents: prEN 15316-1, 15316-2, 15316-3, 15316-4.1, 15316-4.2, 15316-4.3, 15316-4.4, 15316-4.5, 15316-4.8 and 15316-5
|
LC |
|
|
|
|
|
23/12/2014 |
Documento di Lavoro |
Enquiry versions for CEN/TC 228 documents: prEN 15378-1, 15378-3 and 15459-1
|
LC |
|
|
|
|
|
23/12/2014 |
Documento di Lavoro |
Enquiry versions for CEN/TC 228 documents: prEN 12831-1 and 12831-3
|
LC |
|
|
|
|
|
23/12/2014 |
Documento di Lavoro |
First TR and excel files needed to assess the Enquiry for CEN/TC 156 (ventilation) documents (from N. 1281 to N. 1295)
|
LC |
|
|
|
|
|
21/10/2014 |
Documento di Lavoro |
How to adjust the Member States - CEN exchange to be effective during phase 2 (version 3)
|
LC |
|
|
|
|
|
24/04/2014 |
Documento di Lavoro |
CEN M/480 project phase 2 - CEN/TC 89 consortium: How to deal with input data for existing buildings with limited available information
|
LC |
|
|
|
|
|
24/04/2014 |
Documento di Lavoro |
Total comments on prEN 15603
|
LC |
314 |
|
|
|
|
24/04/2014 |
Draft Standard |
CEN/TC 371: FprEN 15603:2014 "Energy performance of buildings Overarching standard EPB"
|
LC |
313 |
|
|
|
|
24/04/2014 |
Documento di Lavoro |
Checklist on MSs usability
|
LC |
|
|
|
|
|
24/04/2014 |
Documento di Lavoro |
Amended LC feedback: main topics
|
LC |
|
|
|
|
|
24/04/2014 |
Documento di Lavoro |
Conclusions from the CA3 Study Tour Usability of the CEN EPB Standards Lisbon, 20-21 January 2014
|
LC |
|
|
|
|
|
07/04/2014 |
Documento di Lavoro |
Amendment on the LC Feedback Report and the accompanying Topics
|
LC |
|
|
|
|
|
20/02/2014 |
Documento di Lavoro |
Nearly Zero Energy Building - towards a common definition (Johann ZIRNGIBL CSTB / France)
|
LC |
|
|
|
|
|
04/02/2014 |
Documento di Lavoro |
Study Tour with CA EPBD and the LC in Lisbon on 20-21 January 2014: "Learning from the past" - By Bruce Young Leader, CA Core Theme 2
|
LC |
|
|
|
|
|
04/02/2014 |
Documento di Lavoro |
Study Tour with CA EPBD and the LC in Lisbon on 20-21 January 2014: "BRE - CEN Standards and the EPBD: Some observations"
|
LC |
|
|
|
|
|
04/02/2014 |
Documento di Lavoro |
Study Tour with CA EPBD and the LC in Lisbon on 20-21 January 2014: "Liaison Committee: role, interaction, issues"
|
LC |
|
|
|
|
|
04/02/2014 |
Documento di Lavoro |
Study Tour with CA EPBD and the LC in Lisbon on 20-21 January 2014: "Status/progress CEN activities and next steps"
|
LC |
|
|
|
|
|
04/02/2014 |
Documento di Lavoro |
Study Tour with CA EPBD and the LC in Lisbon on 20-21 January 2014: "Objective of the Study Tour"
|
LC |
|
|
|
|
|
04/02/2014 |
Documento di Lavoro |
Study Tour with CA EPBD and the LC in Lisbon on 20-21 January 2014: "Conclusions"
|
LC |
|
|
|
|
|
04/02/2014 |
Documento di Lavoro |
Study Tour with CA EPBD and the LC in Lisbon on 20-21 January 2014: "CT5 Towards 2020 Nearly zero-energy buildings Need for defining NZEB in CEN?"
|
LC |
|
|
|
|
|
04/02/2014 |
Documento di Lavoro |
Study Tour with CA EPBD and the LC in Lisbon on 20-21 January 2014: "Block 3: National implementation"
|
LC |
|
|
|
|
|
04/02/2014 |
Documento di Lavoro |
Study Tour with CA EPBD and the LC in Lisbon on 20-21 January 2014: "Issue 8: differentiate according to the EPBD obligations"
|
LC |
|
|
|
|
|
04/02/2014 |
Documento di Lavoro |
Study Tour with CA EPBD and the LC in Lisbon on 20-21 January 2014: "Block 1: Relation EPBD CEN"
|
LC |
|
|
|
|
|
04/02/2014 |
Documento di Lavoro |
Study Tour with CA EPBD and the LC in Lisbon on 20-21 January 2014: "Block 4c: MS Strategy questions"
|
LC |
|
|
|
|
|
04/02/2014 |
Documento di Lavoro |
Study Tour with CA EPBD and the LC in Lisbon on 20-21 January 2014: "Block 4b: Example Cases"
|
LC |
|
|
|
|
|
04/02/2014 |
Documento di Lavoro |
Study Tour with CA EPBD and the LC in Lisbon on 20-21 January 2014: "Block 3: National implementation"
|
LC |
|
|
|
|
|
04/02/2014 |
Documento di Lavoro |
Study Tour with CA EPBD and the LC in Lisbon on 20-21 January 2014: "Some thougts on an Energy Efficient build environment in 10 minutes"
|
LC |
|
|
|
|
|
04/02/2014 |
Documento di Lavoro |
Study Tour with CA EPBD and the LC in Lisbon on 20-21 January 2014: "Block 2: Applicability of the standards"
|
LC |
|
|
|
|
|
13/01/2014 |
Documento di Lavoro |
Some questions for the study tour with CA EPBD and the Liaison Committee in Lisbon on January 20th and 21st 2014
|
LC |
|
|
|
|
|
13/01/2014 |
Documento di Lavoro |
LC-feedback: ten main topics
|
LC |
|
|
|
|
|
13/01/2014 |
Documento di Lavoro |
For the EPB set of standards: Explanation of the concept of 'National Annexes' and more - 2nd draft, prepared by Dick van Dijk
|
LC |
|
|
|
|
|
13/01/2014 |
Documento di Lavoro |
Report: Feedback Liaison Committee on the CE-EPBD draft deliverables (Mandate M/480 - Phase 1)
|
LC |
|
|
|
|
|
13/01/2014 |
Documento di Lavoro |
Agenda of LC meeting held on 18 December 2013
|
LC |
|
|
|
|
|
13/01/2014 |
Convocazione |
Invitation, agenda and general information for CA3 study tour: 2021 January, Lisbon
|
LC |
|
|
|
|
|
13/01/2014 |
Resoconto Riunione |
Draft Minutes of LC meeting held on December 18th 2013 in Delft
|
LC |
|
|
|
|
|
13/01/2014 |
Draft Standard |
Energy performance of buildings Overarching standard EPBD
|
LC |
|
|
|
|
|
16/10/2013 |
Documento di Lavoro |
Concise version of the presentation during the CEN meeting in Malmö: Progress of the Liaison Committee activities
|
LC |
|
|
|
|
|
16/10/2013 |
Documento di Lavoro |
LS Partial performance indicators, 2013-10-09
|
LC |
|
|
|
|
|
16/10/2013 |
Documento di Lavoro |
LC presentation on CEN meeting, 2013-10-09
|
LC |
|
|
|
|
|
16/10/2013 |
Documento di Lavoro |
CEN-LC-CA3 workshop, Malmo: presentation by Johann Zirngibl
|
LC |
|
|
|
|
|
16/10/2013 |
Documento di Lavoro |
Categorization of spaces for the energy performance assessment - CEN-CA3 Workshop, Malmo (by Dick Van Dijk)
|
LC |
|
|
|
|
|
16/10/2013 |
Documento di Lavoro |
CEN workshop connected to the CA3 in cooperation with LC
|
LC |
|
|
|
|
|
15/07/2013 |
Resoconto Riunione |
Final minute of CAP-LC meeting held in Delft on June 6th 2013
|
LC |
|
|
|
|
|
08/07/2013 |
Documento di Lavoro |
CEN standards development and CAP-EDMC Liai son Committee news: Evaluation process of the CEN deliverables Phase 1
|
LC |
|
|
|
|
|
06/06/2013 |
Documento di Lavoro |
Adjusted approach towards the CEN]LC meeting Delft, June 6 2013
|
LC |
|
|
|
|
|
17/05/2013 |
Documento di Lavoro |
Final evaluation report on the draft CEN documents "Basic Principles, Overarching Standard and Technical Rules"
|
LC |
|
|
|
|
|
22/03/2013 |
Documento di Lavoro |
EU Mandate (M480) for CEN to develop the second generation CEN-EPBD standards supporting the implementation of the EPBD Recast - Results Phase 1 and preparing Phase 2 (by Jaap Hogeling, Chair CEN TC 371)
|
LC |
|
|
|
|
|
22/03/2013 |
Documento di Lavoro |
CAP-EDMC-LC: Progress & next steps for EDMC meeting (March 19, 2013 - Brussels)
|
LC |
|
|
|
|
|
22/03/2013 |
Documento di Lavoro |
Letter form LC about the information on the evaluation approach of the draft CEN EPBD deliverables from phase 1
|
LC |
|
|
|
|
|
05/11/2012 |
Documento di Lavoro |
Notes from the meeting between the LC and the CEN TC371 CAP/WG1 in Brussels on 23 October 2012
|
LC |
|
|
|
|
|
11/09/2012 |
Documento di Lavoro |
LC questionnaire on functional & design criteria for a new set of CEN standards
|
LC |
|
|
|
|
|
11/09/2012 |
Documento di Lavoro |
Interaction between the CAP-EDMC Liaison Committee and CA EPBD III
|
LC |
|
|
|
|
|
11/09/2012 |
Documento di Lavoro |
The role of the Liaison Committee
|
LC |
|
|
|
|
|
11/09/2012 |
Documento di Lavoro |
CAP-EDMC-LC Input to CEN EPBD: Content of the presentation of the CEN/TC371 - CAP-EDMC-LC Workshop May 30, 2012 in Athens
|
LC |
|
|
|
|
|
11/09/2012 |
Business Plan |
TUNING MS NEEDS AND THE DEVELOPMENT OF CEN STANDARDS: Playing field, Interaction structure, Criteria Member States, Modus operandi
|
LC |
|
|
|
|
|
16/07/2012 |
Resoconto Riunione |
Minutes of teh LC meeting: 27th of April 2012
|
LC |
|
|
|
|
|
16/07/2012 |
Resoconto Riunione |
Minutes of the CAP-LC meeting 27th of April 2012
|
LC |
|
|
|
|
|
26/06/2012 |
Documento di Lavoro |
Final version of the document "CEN EPBD standards development: Input based on questionnaire to Member States spring 2012"
|
LC |
|
|
|
|
|
26/06/2012 |
Documento di Lavoro |
Questionnaire IV: Final Summery - Inspection of Heating and Air Conditioning systems (EPBD art. 14, 15, 16)
|
LC |
|
|
|
|
|
26/06/2012 |
Documento di Lavoro |
Questionnaire III: Final Summery - Existing buildings: providing EP - certificates (EPBD art. 11)
|
LC |
|
|
|
|
|
26/06/2012 |
Documento di Lavoro |
Questionnaire II: Final Summery - Existing buildings: Assessment of the EP (EPBD art. 7, 8)
|
LC |
|
|
|
|
|
26/06/2012 |
Documento di Lavoro |
Questionnaire I: Final Summery - New buildings: assessment of the Energy Performance (EPBD art. 6)
|
LC |
|
|
|
|
|
26/06/2012 |
Resoconto Riunione |
Draft minutes from the morning LC meeting hold in Athens last 30th May 2012
|
LC |
|
|
|
|
|
05/06/2012 |
Documento di Lavoro |
CEN/TC 371 CAP-EDMC-LC Workshop in Athens on 2012-05-30: Presentation Mr. Socal
|
LC |
038 |
|
|
|
|
05/06/2012 |
Documento di Lavoro |
CEN/TC 371 CAP-EDMC-LC Workshop in Athens on 2012-05-30: Presentation Mr. Van Dijk
|
LC |
037 |
|
|
|
|
05/06/2012 |
Documento di Lavoro |
CEN/TC 371 CAP-EDMC-LC Workshop in Athens on 2012-05-30: Presentation Mr. Zirngibl
|
LC |
036 |
|
|
|
|
05/06/2012 |
Documento di Lavoro |
CEN/TC 371 CAP-EDMC-LC Workshop in Athens on 2012-05-30: Presentation Mr. Hogeling
|
LC |
035 |
|
|
|
|
05/06/2012 |
Documento di Lavoro |
CEN/TC 371 CAP-EDMC-LC Workshop in Athens on 2012-05-30: Presentation Mr. Aggerholm
|
LC |
034 |
|
|
|
|
05/06/2012 |
Documento di Lavoro |
CEN/TC 371 CAP-EDMC-LC Workshop in Athens on 2012-05-30: Programme
|
LC |
039 |
|
|
|
|
04/06/2012 |
Documento di Lavoro |
Presentation by the Liaison Committee from CEN/TC 371-CAP-EDMC-LC workshop hold last 30 May in Athens
|
LC |
|
|
|
|
|
25/05/2012 |
Documento di Lavoro |
Questionnaire IV: Inspection of Heating and Air Conditioning systems (EPBD art. 14, 15, 16) - Draft 23-05-2012
|
LC |
|
|
|
|
|
25/05/2012 |
Documento di Lavoro |
Questionnaire III: Existing buildings: providing EP certificates (EPBD art. 11) - Draft 23-05-2012
|
LC |
|
|
|
|
|
25/05/2012 |
Documento di Lavoro |
Questionnaire II: Existing buildings: Assessment of the EP (EPBD art. 7,8) - Draft 23-05-2012
|
LC |
|
|
|
|
|
25/05/2012 |
Documento di Lavoro |
Questionnaire I: New buildings: assessment of the Energy Performance (EPBD art. 6) - Draft 23-05-2012
|
LC |
|
|
|
|
|
25/05/2012 |
Documento di Lavoro |
EPBD standards decision making matrix: Member States part - 2012-05-23 Draft
|
LC |
|
|
|
|
|
25/05/2012 |
Documento di Lavoro |
CEN EPBD standards development: Input based on questionnaire to Member States spring 2012 - 2012-05-23 Draft
|
LC |
|
|
|
|
|
15/05/2012 |
Convocazione |
Invitation to the CEN/TC371 and Liaison Committee workshop: 30 May 2012, Athens, Greece
|
LC |
|
|
|
|
|
02/05/2012 |
Documento di Lavoro |
EPBD standards decision making matrix
|
LC |
|
|
|
|
|
02/05/2012 |
Documento di Lavoro |
CEN EPBD standards development: Input based on four questionnaires to Member States spring 2012
|
LC |
|
|
|
|
|
02/05/2012 |
Documento di Lavoro |
Questionnaire I: New buildings: assessment of the Energy Performance (EPBD art. 6)
|
LC |
|
|
|
|
|
02/05/2012 |
Documento di Lavoro |
Questionnaire II: Existing buildings: Assessment of the EP (EPBD art. 7, 8)
|
LC |
|
|
|
|
|
02/05/2012 |
Documento di Lavoro |
Questionnaire III: Existing buildings: providing EP]certificates (EPBD art. 11)
|
LC |
|
|
|
|
|
02/05/2012 |
Documento di Lavoro |
Questionnaire IV: Inspection of Heating and Air Conditioning systems (EPBD art. 14, 15, 16)
|
LC |
|
|
|
|
|
19/04/2012 |
Convocazione |
Invitation and agenda to next meeting of Liaison Committee: 27 April 2012, Rotterdam
|
LC |
|
|
|
|
|
04/04/2012 |
Documento di Lavoro |
Member List
|
LC |
|
|
|
|
|
04/04/2012 |
Documento di Lavoro |
CAP-EDMC-LC Questionnaire: Usability criteria of the revised set of EPBD CEN standards
|
LC |
|
|
|
|
|
04/04/2012 |
Documento di Lavoro |
Questionnaire IV: Inspection of technical building systems (EPBD art. 14, 15, 16)
|
LC |
|
|
|
|
|
27/02/2012 |
Documento di Lavoro |
Mail from Bart Poel Consultancy: Update on the Liaison Committee activities and letters of answer from CEN-CENELEC and EC
|
LC |
|
|
|
|
|
27/02/2012 |
Documento di Lavoro |
Response on tuning EPBD and Ecodesign standards forn CEN and CENELEC (activity on Mandate M/480 and M/495)
|
LC |
|
|
|
|
|
27/02/2012 |
Documento di Lavoro |
Replay of EC on the Ecodesign EPBD tuning letter (activity under Mandate M/480 and M/495)
|
LC |
|
|
|
|
|
13/02/2012 |
Documento di Lavoro |
DIRECTIVE 2010/31/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL
|
LC |
|
|
|
|
|
13/02/2012 |
Resoconto Riunione |
Minute of EPBD CEN Liaison Committee (ECLC) meeting hold on June 28th 2011, in The Hague
|
LC |
|
|
|
|
|
13/02/2012 |
Resoconto Riunione |
Minute of CEN Liaison Committee working session hold in Zürich on October 24th 2011
|
LC |
|
|
|
|
|
23/01/2012 |
Documento di Lavoro |
Glasscubes rooms: Answer from E. Maldonado
|
LC |
|
|
|
|
|
23/01/2012 |
Documento di Lavoro |
Information mail on CAP-EDMC LC-Glasscubes rooms
|
LC |
|
|
|
|
|
16/01/2012 |
Documento di Lavoro |
Letter to the director-generals of CEN, DG Energy and DG Enterprise and Industry concerning tuning EPBD and Ecodesign standards was sent out
|
LC |
|
|
|
|