CTI | Cti2000.it
Viale Elvezia, 12 - 20154 Milano
Tel. +39 02 266.265.1
Fax +39 02 266.265.50
P.IVA 11494010157
Path: Home » Indice Pubblicazioni » Convegni ATI - Accesso riservato soci CTI » CA - 63 - Palermo 2008 » History and results about operation o...
Autore: F. De Benedictis, M. Gariglio, M. Santarelli, G. Disegna, G. Orsello, M. Calì
Collana: CA - 63 - Palermo 2008
Note:
TurboCare and Politecnico di Torino have installed a SOFC laboratory in cooperation with Envipark of Torino in order to analyze the operation, in cogenerative configuration, of two SOFC generators (EOS and EBE projects) built by Siemens PG Stationary Fuel Cells.
In this paper a results overview of the experimental activities and operation of the first three years of operation of the plants and of the several experimental activities performed to analyze the system behavior, are shown. In particular, on both
generators, the effect of the main operators parameters (stack current, fuel utilization, stack temperature, process air temperature and flow) on performance generators was carried out.
Per scaricare il Documento devi essere loggato! |